欢迎访问ic37.com |
会员登录 免费注册
发布采购

CBC915-ACA777 参数 Datasheet PDF下载

CBC915-ACA777图片预览
型号: CBC915-ACA777
PDF下载: 下载PDF文件 查看货源
内容描述: 的EnerChip EP通用能量收集EVAL KIT [EnerChip EP Universal Energy Harvester Eval Kit]
分类和应用:
文件页数/大小: 15 页 / 1102 K
品牌: CYMBET [ CYMBET CORPORATION ]
 浏览型号CBC915-ACA777的Datasheet PDF文件第2页浏览型号CBC915-ACA777的Datasheet PDF文件第3页浏览型号CBC915-ACA777的Datasheet PDF文件第4页浏览型号CBC915-ACA777的Datasheet PDF文件第5页浏览型号CBC915-ACA777的Datasheet PDF文件第7页浏览型号CBC915-ACA777的Datasheet PDF文件第8页浏览型号CBC915-ACA777的Datasheet PDF文件第9页浏览型号CBC915-ACA777的Datasheet PDF文件第10页  
CBC-EVAL-09 EnerChip EP Universal EH Eval Kit
EVAL-09 Mode Inquiry Switch and LED Mode Indicators
A push button switch S2 as shown in Figure 3 is used to display the EVAL-09 energy conversion state and
charging status. There are 3 LEDs that indicate the 3 modes.
MPPT LED (MPPT)
– Maximum Peak Power Tracking - Indicates the Energy Processor is adjusting the input im-
pedance to match the transducer impedance. Any time the Energy Processor is performing the MPPT function,
the LED will flash momentarily (1 millisecond). The LED will be lit momentarily every time the Energy Processor
enters this state or when the push button is pressed. To force MPPT state, hold S2 while connecting the EH
transducer. When MPPT LED flashes, release push button switch S2. Target system MCU or SW1 changes can
also force MPPT.
Output Holding Cap Charge LED (CAP)
– This indicates the capacitor used to hold output charge for the target
load is being charged. The CAP LED will be lit momentarily every time the Energy Processor enters this state on
its own, and in response to pressing S2 if in this state.
EnerChip Charge LED (EC)
- This indicates the EnerChip devices are being charged and power is turned on to
the load. The LED will be lit momentarily every time the Energy Processor enters this state, and state indicates
the EnerChips are being charged, but the system is not yet in regulation (e.g., due to insufficient power being
available).
Charge Sequence Complete - Independent of the push button, once the Energy Processor has completed the
sequence of MPPT, Cap Charge and EnerChip Charge, all three LEDs will be flashed for 1 millisecond. In this
state, system is in regulation.
EVAL-09 Output Power Disconnect – In order to remove the output voltage from the target load, press switch
S2 and hold for 5 seconds. Initially all three LEDs will flash (if the system was in regulation), or the EC LED will
flash (if the system was out of regulation). After 5 seconds, Cap Charge and EC Charge LEDs will flash, indicat-
ing the output voltage has been disconnected. A momentary press of switch S2 will indicate state information
after the power has been disconnected from the load.
EVAL-09 Output Power Reconnect - In order apply output voltage to the target load, press switch S2 and hold
for 5 seconds. Initially all three LEDs will flash (if the system was in regulation), or the EC and MPPT LEDs will
flash (if the system was out of regulation). After 5 seconds, Cap Charge and EC Charge LEDS will flash, indicat-
ing the output voltage has been reconnected.
DS-72-13 Rev G
©2013 Cymbet Corporation • Tel: +1-763-633-1780 • www.cymbet.com
Page 6 of 15