BConnector
Operating Instructions, precautions and recommendations
qBottom
Contact Type (common for 0.5mm/1mm)
Operation
Precautions
1) Avoid grasping the actuator with two fingers or lift-
ing the actuator with fingernail.
1. FPC/FFC Termination procedure.
Connector installed on the board.
1) Lift up the actuator. Use thumb or index finger.
2) Rotate down the actuator until firmly closed.
It is critical that the inserted FPC/FFC is not moved
and remains fully inserted. Should the FPC/FFC be
moved, open the actuator and repeat the process,
starting with Step 1 above.
2) Fully insert the FPC/FFC parallel to mounting sur-
face, with the exposed conductive traces facing
down.
Stiffener
FPC/FFC conductive traces
2. FPC/FFC Removal
1) Lift up the actuator.
2) Carefully remove the FPC/FFC.
3) Due to the structure of the connectors, they do
not have strong resistance to upward pulling;
therefore, support the FPC/FFC when a pulling
force is applied to it.
9