欢迎访问ic37.com |
会员登录 免费注册
发布采购

U642B 参数 Datasheet PDF下载

U642B图片预览
型号: U642B
PDF下载: 下载PDF文件 查看货源
内容描述: 汽车雨刮/清洗或间隔切换 [Automotive Wipe/Wash or Interval Switch]
分类和应用:
文件页数/大小: 6 页 / 97 K
品牌: TEMIC [ TEMIC SEMICONDUCTORS ]
 浏览型号U642B的Datasheet PDF文件第1页浏览型号U642B的Datasheet PDF文件第3页浏览型号U642B的Datasheet PDF文件第4页浏览型号U642B的Datasheet PDF文件第5页浏览型号U642B的Datasheet PDF文件第6页  
U642B  
Pin Configuration  
Pin  
1
2
3
4
5
6
7
8
Symbol  
GND  
Function  
GND  
1
2
8
+V  
Batt  
Ground  
Input 1 Interval switch  
Timing capacitor C  
RELAY  
Input 1  
t
c
7
6
2
R
4
Afterwiping time resistance  
WIWA Wipe/Wash switch  
Park switch for wiper motor  
RELAY Relay control output  
+V Supply voltage KI. 15  
U642B  
t
c
S
1
3
4
S
1
WIWA  
R
4
5
Batt  
93 7691  
Figure 2. Pinning  
Circuit Description  
at the capacitor is greater than 6.5 V, the relay is turned  
on as long as the switch ”WIWA” is closed.  
Interval Function, Pin 2  
By closing the internal switch, S , to supply voltage,  
2
The after-wipe-time begins after the switch is open  
whereas the sources D and F are switched OFF and the  
source E is activated. Source E discharges the capacitor  
till the voltage is less than 2.2 V. The relay is OFF and the  
wiper-motor is switched OFF. The after-wipe-time is  
determined by the current source E which can be  
+V , the motor is activated. The internal current source  
Batt  
(Pin 3) which holds the capacitor C in charged state is  
2
switched-OFF. As soon as there is a positive potential at  
the park switch (S ), current source F (see figure 1)  
1
charges the capacitor C very fast. After the wiper  
2
operation is finished, S is again at ground potential, the  
1
regulated with the external resistor R  
. Afterwards the  
Time  
relay is in OFF position – interval pause begins – the  
source A discharges the capacitor. Relay switch OFF is  
capacitor C is discharged through the current source C,  
2
independent of the park switch S .  
till the voltage at Pin 3 is below the threshold of 2 V.  
Interval pause can be adjusted between 4 s to 20 s with the  
1
Interval and WIWA Functions  
help of potentiometer R . Now the relay switches ON and  
3
the next interval cycle begins. Opening switch S causes  
The interval function is interrupted immediately when the  
2
current source A to discharge C immediately and current  
switch S is activated. The current source A discharges  
2
2
sources C and F are switched-OFF.  
the capacitor to a value of 2 V, afterwards the normal S  
function starts.  
2
Wipe/Wash (WIWA) Operation, Pin 5  
Interval wiping starts immediately when the after-wipe-  
time is over. The switching delays are slightly shorter,  
because the capacitor is already charged to a value of 2 V.  
By closing the WIWA-switch, S , to supply voltage,  
3
+V , water pump starts spraying the water on the wind-  
Batt  
screen, the current source A is switched-OFF which keeps  
the capacitor C in discharged state. Now the capacitor is The Wipe/Wash function is not interrupted when interval  
2
charged through the current sources D and F, and when af- switch S is activated. Interval function begins after the  
2
ter a time interval of approximately 100 ms, the voltage WIWA function is over.  
2 (6)  
TELEFUNKEN Semiconductors  
Rev. A1, 13-Feb-97