欢迎访问ic37.com |
会员登录 免费注册
发布采购

600-083-1 参数 Datasheet PDF下载

600-083-1图片预览
型号: 600-083-1
PDF下载: 下载PDF文件 查看货源
内容描述: 带IT®盾终端系统 [Band-It? Shield Termination System]
分类和应用:
文件页数/大小: 1 页 / 205 K
品牌: GLENAIR [ GLENAIR, INC. ]
   
Series 72
Guardian
Micro Band Tool
Part Number 600-061
BAnd-it® Shield termination System
BAND-IT® shield termination system
Fast, Cost-Effective Shield termination
Attach cable braid shields to EMI backshells with
BAND-IT
®
stainless steel straps. The
BAND-IT
®
system offers fast termination and the flexibility to handle different diameters with the same band.
iMPORtant nOtE: aLWaYS dOUbLE-WRaP bandS!
Contact Glenair or visit our website (glenair.com) to view our complete line of BAND-IT®
products, including pneumatic tools for high production and calibration kits.
Standard Band Tool
Part Number 600-058
1.18 lbs. / 6.75 Inches (172mm.) Length
How to order Bands
Band Type
in.
Micro Band, Standard Length
Micro Band, Extended Length
Standard Band, Standard Length
Standard Band, Extended Length
.120
.120
Width
mm.
3.05
3.05
6.10
6.10
Length
in.
8.125
14.25
14.256
18.00
Part Number
Uncoiled
600-057
600-083
600-052
600-090
Coiled
600-057-1
600-083-1
600-052-1
600-090-1
mm.
206.38
361.95
362.10
457.20
Use With
Tool
600-061
600-061
600-058
600-058
Accomodates
Dia.
in.
.88
1.88
1.80
2.50
mm.
22.35
47.75
45.72
63.50
.240
.240
BAND-IT® Shield Termination Instructions
1.
Prepare Cable Braid for termination process
(Figure 1).
2.
Push Braid forward over Adapter Reten-
tion Lip to the Adapter Incline Point (or
.4" [10.2mm] minimum braid length). Milk
Braid as required to remove slack and insure
a snug fit around the shield termination
area (Figure 2).
3.
Prepare the Band in the following manner:
IMPORTANT: Due to Connector/Adapter
circumference, it may be necessary to
prepare the Band around the Cable or
Retention Area.
A. Roll Band through the Buckle Slot
twice. (Bands must be double-coiled.)
B. Pull on Band until Mark ( ) is within
approximately .250 inch (6.4mm) of
Buckle Slot (Figure 3). The Band may
be tightened further if desired.
nOtE:
Prepared band should have (
)
Mark visible approximately where shown in
Figure
3.
Shield Termination
Clamping Process (Figures 4 thru 8)
NOTE:
To free Tool Handles, move Holding Clips
to center of Tool.
4.
Squeeze Gripper Release Lever and insert
Band into the front end opening of the
Tool. (NOTE: Circular portion of looped
band must always face downward.)
5.
Aligning the Band and Tool with the Shield
Termination Area, squeeze Black Pull-Up
Handle repeatedly using short strokes until
it locks against Tool Body. (This indicates
the Band is compressed to the Tool Preca-
librated Tension.)
NOTE: If alignment of band and shield is
unsatisfactory, tension on band can be
relaxed by pushing on slotted release
lever on top of tool. Make adjustments as
necessary and again squeeze black pull-up
handle.
6.
Complete the Clamping Process by squeez-
ing the Gray Cut-Off Handle.
7.
Remove excess band from tool and dispose.
8.
Inspect Shield Termination.
CAGE Code 06324
Adapter
retention Lip
Conductors
Braid
.400 (1.2mm) min.
Length Braid Over
Termination Area
1
Adapter
Incline
2
Buckle
3
Tail Length
Indicator mark
4
5
6
7
8
Printed in U.S.A.
©2011 Glenair, Inc.
GLENAIR, INC. • 1211 AIR WAY • GLENDALE, CA 91201-2497 • 818-247-6000 • FAX 818-500-9912
42