BConnector Operating Instructions, precautions and recommendations
Operation
Precautions
1) Fully insert the FPC parallel to mounting surface,
with the exposed conductive traces facing down.
1.FPC Termination procedure. Connector
installed on the board.
1) Remove and dispose the pick-and-place insert.
Positioning point
2) Rotate down the actuator until firmly closed.
It is critical that the inserted FPC is not moved and
remains fully inserted. Should the FPC be moved,
open the actuator and repeat the process, starting
with Step 1 above.
2) The connector will assure reliable performance
when the actuator is open to 120° maximum (see
fig.1) Do not exceed this angle, as this may cause
permanent damage to the connector.
Fig.1
120°
3) Do NOT push/pull actuator. Any damage to actua-
tor will require replacement of the entire connec-
tor.
2.FPC Removal
1) Lift up the actuator.
2) Carefully remove the FPC.
68