X25128
ABSOLUTE MAXIMUM RATINGS*
*COMMENT
Temperature under Bias ...................–65°C to +135°C
Storage Temperature........................–65°C to +150°C
Voltage on any Pin with
Stresses above those listed under “Absolute Maximum
Ratings” may cause permanent damage to the device.
This is a stress rating only and the functional operation
of the device at these or any other conditions above
those indicated in the operational sections of this
specification is not implied. Exposure to absolute
maximum rating conditions for extended periods may
affect device reliability.
Respect to V .................................... –1V to +7V
SS
D.C. Output Current..............................................5mA
Lead Temperature
(Soldering, 10 seconds) ..............................300°C
RECOMMENDED OPERATING CONDITIONS
Temperature
Commercial
Industrial
Min.
0°C
Max.
+70°C
+85°C
+125°C
Supply Voltage
X25128
Limits
5V ±10%
–40°C
–55°C
X25128-2.7
2.5V to 5.5V
3091 FM T07.2
Military
3091 FM T06.1
D.C. OPERATING CHARACTERISTICS
Limits
Symbol
Parameter
Min.
Max.
Units
Test Conditions
ICC
VCC Supply Current (Active)
5
mA SCK = VCC x 0.1/VCC x 0.9 @ 2 MHz,
SO = Open, CS = VSS
ISB
ILI
VCC Supply Current (Standby)
Input Leakage Current
Output Leakage Current
Input LOW Voltage
1
µA
µA
µA
V
CS = VCC, VIN = VSS or VCC
VIN = V to VCC
10
10
SS
ILO
VOUT = V to VCC
SS
(1)
VlL
–1
VCC x 0.3
VCC + 0.5
0.4
(1)
VIH
Input HIGH Voltage
VCC x 0.7
V
VOL1
VOH1
VOL2
VOH2
Output LOW Voltage
Output HIGH Voltage
Output LOW Voltage
Output HIGH Voltage
V
VCC = 5V, IOL = 3mA
VCC = 5V, IOH = -1.6mA
VCC = 3V, IOL = 1.5mA
VCC = 3V, IOH = -0.4mA
VCC – 0.8
VCC – 0.3
V
0.4
V
V
POWER-UP TIMING
Symbol
Parameter
Power-up to Read Operation
Power-up to Write Operation
Min.
Max.
Units
ms
(3)
tPUR
1
5
(3)
tPUW
ms
3091 FM T09
CAPACITANCE T = +25°C, f = 1MHz, V = 5V
A
CC
Symbol
Test
Max.
Units
pF
Conditions
VOUT = 0V
VIN = 0V
(2)
COUT
Output Capacitance (SO)
8
6
(2)
CIN
Input Capacitance (SCK, SI, CS, WP, HOLD)
pF
3091 FM T10.1
Notes: (1) V min. and V max. are for reference only and are not tested.
IL
IH
(2) This parameter is periodically sampled and not 100% tested.
(3) t and t are the delays required from the time V is stable until the specified operation can be initiated.These
PUR
PUW
CC
parameters are periodically sampled and not 100% tested.
8